Third Party Inspection for Ground Storage Tank-


            Reference Documents-
1.    Design code
2.    Purchase order specification
3.    Purchaser's standards
4.    Approved drawings
5.    API 650
6.    API 620
7.    API 653
8.    BS 2654


Inspection Activities from start to finish-

  •             Material Inspection
  •            Fabrication Inspection
  •            Plate Preparation
  •            Shell Courses and Base Plates containing Welded Seams
  •            Post Weld Heat Treatment of Hot Formed Components
  •            Assembly Inspection
  •             Painting and Coating         
  •            Spares and Accessories
  •            Reporting
  •            Fabrication Shop Documents
  •           Site Erection
  •           Site Erection Test
  •           Site Erection Documentation
  •           Site Erection - Final Certification
  •           Reporting
  •           Inspection Visit Report (IVR)
  •        Release Note


Comments

Popular posts from this blog

Important point for Welding Inspector-(SE-1)

Third Party Inspection for Pressure Vessel –

Radiography Test Film Inspection as per ASME B 31.1

Third Party Inspection for Valve - Procedure

Pressure Vessel Inspection as per ASME SEC VIII DIV.1

Third Party Inspection for Shell and Tube Heat Exchanger-

Important point for Welding Inspector-SE-2

(Importants) ASME and National Board Stamps-