Third Party Inspection for Ground Storage Tank-

            Reference Documents- 1.     Design code 2.     Purchase order specification 3.     Purchaser's standards 4.     Approved drawings 5.     API 650 6.     API 620 7.     API 653 8.     BS 2654 Inspection Activities from start to finish-              Material Inspection            Fabrication Inspection            Plate Preparation            Shell Courses and Base Plates containing Welded Seams            Post Weld Heat Treatment of Hot Formed Components            Assembly Inspection             Painting and Coating              ...

Important point for Welding Inspector-SE-4

Duties during welding-

1.Site/field welding-
   Ensure weather conditions are suitable/comply with Code (conditions will not affect welding).

2.Welding process-
    In accordance with WPS.

3.Preheat (if required)- Minimum temperature is being maintained in accordance with WPS.

4.Interpass temperature-
   Maximum temperature is in accordance with WPS.

5.Welding consumables-
   In accordance with WPS and being controlled as procedure.

6.Welding parameters-
   Current, volts, travel speed are in accordance with WPS.

7.Root run-
   Visually acceptable to Code before filling the joint (for single sided welds).

8.Gouging/grinding-
   By an approved method and to good workmanship standard.

9.Inter-run- cleaning To good workmanship standard.

10.Welder-
     On the approval register/qualified for the WPS being used.

Important point for Welding Inspector-(SE-1)

Comments

Popular posts from this blog

Important point for Welding Inspector-(SE-1)

Third Party Inspection for Pressure Vessel –

Radiography Test Film Inspection as per ASME B 31.1

Third Party Inspection for Ground Storage Tank-

Third Party Inspection for Valve - Procedure

Pressure Vessel Inspection as per ASME SEC VIII DIV.1

Third Party Inspection for Shell and Tube Heat Exchanger-

Important point for Welding Inspector-SE-2

(Importants) ASME and National Board Stamps-