Reference Documents- 1. Design code 2. Purchase order specification 3. Purchaser's standards 4. Approved drawings 5. API 650 6. API 620 7. API 653 8. BS 2654 Inspection Activities from start to finish- Material Inspection Fabrication Inspection Plate Preparation Shell Courses and Base Plates containing Welded Seams Post Weld Heat Treatment of Hot Formed Components Assembly Inspection Painting and Coating ...
Important Point For Pressure Vessel Inspector-E-3
- Get link
- X
- Other Apps
JOINT EFFICIENCIES-
The inspector must be able to determine the joint efficiency "E" of a vessel weld. Inspector should be able to determine:
a) Weld Joint Categories (ASME Section VIII, UW-3);
b) Type of radiography (full, spot, or none) performed basis the nameplate markings (RT-1, RT-2, etc.); (UW -11)
c) Joint efficiency by reading Table UW-12;
d) Joint efficiency for seamless heads and vessels Sections per UW-12 (d); and
e) Joint efficiency for welded pipe and tubing per UW-12 (e).
Determining joint efficiency may be part of the internal pressure problem since joint efficiency "E" is used in the formulas for determining required thickness or Vessel Part MAWP.