Third Party Inspection for Ground Storage Tank-

            Reference Documents- 1.     Design code 2.     Purchase order specification 3.     Purchaser's standards 4.     Approved drawings 5.     API 650 6.     API 620 7.     API 653 8.     BS 2654 Inspection Activities from start to finish-              Material Inspection            Fabrication Inspection            Plate Preparation            Shell Courses and Base Plates containing Welded Seams            Post Weld Heat Treatment of Hot Formed Components            Assembly Inspection             Painting and Coating              ...

Important Point for Welding Inspector-SE-6

Important Point for Welding Inspector-which keep in mind for vendor fabrication inspection
(check and review all given things).

  • Availability of aprroved drawing
  • Availability of material
  • Availability of approved wps
  • Welding engineer will write the wps
  • Welder will make a test coupen according to this wps.
  • Ndt of this test coupen
  • Dt test
  • After aprroval of wps next welder qualification.
  • After welder qualification. card to welder
  • Visual inspection of shop
  • NDT
  • Report




Comments

Popular posts from this blog

Important point for Welding Inspector-(SE-1)

Third Party Inspection for Pressure Vessel –

Radiography Test Film Inspection as per ASME B 31.1

Third Party Inspection for Ground Storage Tank-

Third Party Inspection for Valve - Procedure

Pressure Vessel Inspection as per ASME SEC VIII DIV.1

Third Party Inspection for Shell and Tube Heat Exchanger-

Important point for Welding Inspector-SE-2

(Importants) ASME and National Board Stamps-