Reference Codes-
- Design code
- Purchase order specification
- Purchaser's standards
- Approved drawings
- ASME I
- ASME V
- ASME IX
- BS 1113
Required
Documents for Third Party Inspector Review:
- Manufacture Quality Control Plan
- ITP
- Data Sheet
- Approved Drawings
- Strength calculation sheets
- Material Test Reports
- WPS and PQR
- Welding Map
- Repair Procedure
- WQR
- NDE procedures (VT,RT,UT,MPT,DPT and PMI)
- NDE Personnel Qualifications Reports
- Heat treatment procedure
- Calibration Certificates for test equpments
- Hydrostatic Testing Procedure and Water Quality Document
- Painting Procedure
- Preservation,Packing and Shipping Procedure
- Packing List
Inspection activities for Water Tube Boiler -
(From start to finish)-
- Material Inspection
- Fabrication
- Tubes and Integral Piping
- Post Hydrostatic Testing
- Final Assembly
- Name Plate Checking
- Painting and coating
- Spares, Loose Items, Tools and Accessories:
- Reporting:
- Release Note:
- Packing,
- Marking and Shipping:
- Final Book (Dossier)
The following final
documents are reviewed and signed off by third party inspector-
- As built, drawings if
required,
- Manufacturer's data reports,
- Material certificate or
certified mill test reports for all pressure parts,
- Material list or
map,
- Welder record for each seam or map,
- Heat treatment records (Temperature-time
record chart during (PWHT),
- Dimensional record,
- NDE
records,
- Production test record/mock test record,
- Alloy verification
records, (if required),
- Hydrostatic test record,
- Pneumatic test
record Hardness test record,
- Post weld heat treatment NDE, if
specified,
- Name plate or other marks,
- Packing list,
- Spare parts and
tool list
Other Topics-
Third Party Inspection for Shell and Tube Heat Exchanger-
Third Party Inspection for Valve - Procedure-
Third Party Inspection for Ground Storage Tank-
Third Party Inspection for Pressure Vessel –
Flanges Used In Oil and Gas Field-
(Importants) ASME and National Board Stamps-
Pressure Vessel Inspection as per ASME SEC VIII DIV.1
Third Party Inspection for Fire Tube Boiler - Procedure