Third Party Inspection for Ground Storage Tank-

            Reference Documents- 1.     Design code 2.     Purchase order specification 3.     Purchaser's standards 4.     Approved drawings 5.     API 650 6.     API 620 7.     API 653 8.     BS 2654 Inspection Activities from start to finish-              Material Inspection            Fabrication Inspection            Plate Preparation            Shell Courses and Base Plates containing Welded Seams            Post Weld Heat Treatment of Hot Formed Components            Assembly Inspection             Painting and Coating              ...

Third Party Inspection for Water Tube Boiler - Procedure

Reference Codes-

  • Design code
  • Purchase order specification
  • Purchaser's standards
  • Approved drawings
  • ASME I
  • ASME V
  • ASME IX
  • BS 1113

Required Documents for Third Party Inspector Review:
  • Manufacture Quality Control Plan 
  • ITP
  • Data Sheet
  • Approved Drawings
  • Strength calculation sheets
  • Material Test Reports
  • WPS  and PQR
  • Welding Map
  • Repair Procedure
  • WQR
  • NDE procedures (VT,RT,UT,MPT,DPT and PMI)
  • NDE Personnel Qualifications Reports
  • Heat treatment procedure
  • Calibration Certificates for test equpments
  • Hydrostatic Testing Procedure and Water Quality Document
  • Painting Procedure
  • Preservation,Packing and Shipping Procedure 
  • Packing List

Inspection activities for Water Tube Boiler -
           (From start to finish)-
  • Material Inspection
  • Fabrication
  • Tubes and Integral Piping
  • Post Hydrostatic Testing
  • Final Assembly
  • Name Plate Checking
  • Painting and coating 
  • Spares, Loose Items, Tools and Accessories:
  • Reporting:
  • Release Note:
  • Packing, 
  • Marking and Shipping:
  • Final Book (Dossier)


The following final documents are reviewed and signed off by third party inspector-

  • As built, drawings if required, 
  • Manufacturer's data reports, 
  • Material certificate or certified mill test reports for all pressure parts, 
  • Material list or map, 
  • Welder record for each seam or map, 
  • Heat treatment records (Temperature-time record chart during (PWHT), 
  • Dimensional record,
  • NDE records, 
  • Production test record/mock test record, 
  • Alloy verification records, (if required), 
  • Hydrostatic test record, 
  • Pneumatic test record Hardness test record, 
  • Post weld heat treatment NDE, if specified, 
  • Name plate or other marks, 
  • Packing list, 
  • Spare parts and tool list

Other Topics-

Third Party Inspection for Shell and Tube Heat Exchanger-


Third Party Inspection for Valve - Procedure-

Third Party Inspection for Ground Storage Tank-


Third Party Inspection for Pressure Vessel –


Flanges Used In Oil and Gas Field-


(Importants) ASME and National Board Stamps-


Pressure Vessel Inspection as per ASME SEC VIII DIV.1


Third Party Inspection for Fire Tube Boiler - Procedure

Comments

Popular posts from this blog

Important point for Welding Inspector-(SE-1)

Third Party Inspection for Pressure Vessel –

Radiography Test Film Inspection as per ASME B 31.1

Third Party Inspection for Ground Storage Tank-

Third Party Inspection for Valve - Procedure

Pressure Vessel Inspection as per ASME SEC VIII DIV.1

Third Party Inspection for Shell and Tube Heat Exchanger-

Important point for Welding Inspector-SE-2

(Importants) ASME and National Board Stamps-