Third Party Inspection for Ground Storage Tank-

            Reference Documents- 1.     Design code 2.     Purchase order specification 3.     Purchaser's standards 4.     Approved drawings 5.     API 650 6.     API 620 7.     API 653 8.     BS 2654 Inspection Activities from start to finish-              Material Inspection            Fabrication Inspection            Plate Preparation            Shell Courses and Base Plates containing Welded Seams            Post Weld Heat Treatment of Hot Formed Components            Assembly Inspection             Painting and Coating              ...

Other Important Topics-

Radiography Test Film Inspection as per ASME B 31.1 https://upendratiwari786.blogspot.com/2019/12/radiography-test-film-inspection-as-per.html Casting Definition and Defects- https://upendratiwari786.blogspot.com/2019/12/casting-definition-and-defects.html Raw Material Identification (RMI) MTC Types according to EN 10204. https://upendratiwari786.blogspot.com/2019/12/difference-between-upstreammidstreamdow.html Difference between Code,Standard and Specification- https://upendratiwari786.blogspot.com/2019/12/difference-between-codestandard-and.html PMI inspection- https://upendratiwari786.blogspot.com/2019/12/pmi-inspection.html Visual Examination-as per Code ASME B 31.1 https://upendratiwari786.blogspot.com/2019/12/visual-examination-as-per-code-asme-b.html Common Defects of Steel Forgings- https://upendratiwari786.blogspot.com/2019/12/common-defects-of-steel-forgings.html Forging- https://upendratiwari786.blogspot.com/2019/12/...

Important point for Welding Inspector-

1.Important point for Welding Inspector-SE-1 https://lnkd.in/fsj8CGC 2.Important point for Welding Inspector-SE-2 https://lnkd.in/fuMuUab 3.Important point for Welding Inspector- (Duties before welding)-SE-3 https://lnkd.in/fWZsHpb 4.Important point for Welding Inspector- (Duties during welding)-SE-4 https://lnkd.in/fBA42bY 5.Important points for Welding Inspector- (Duties after welding)-SE-5 https://lnkd.in/f5zxmkn 6.Important Point for Welding Inspector-SE-6 https://lnkd.in/fqtx_9r For Social media update u can also visit- http://travelshortupdate.blogspot.com/

Topics for Third Party Inspection-

Third Party Inspection for Shell and Tube Heat Exchanger- https://upendratiwari786.blogspot.com/2019/12/third-party-inspection-for-shell-and_20.html Third Party Inspection for Valve - Procedure- https://upendratiwari786.blogspot.com/2019/12/third-party-inspection-for-valve.html Third Party Inspection for Ground Storage Tank- https://upendratiwari786.blogspot.com/2019/12/third-party-inspection-for-ground.html Third Party Inspection for Pressure Vessel – https://upendratiwari786.blogspot.com/2019/12/third-party-inspection-for-pressure.html Flanges Used In Oil and Gas Field- https://upendratiwari786.blogspot.com/2020/01/flanges-used-in-oil-and-gas-field.html (Importants) ASME and National Board Stamps- https://upendratiwari786.blogspot.com/2020/01/importants-asme-and-national-board.html Pressure Vessel Inspection as per ASME SEC VIII DIV.1 https://upendratiwari786.blogspot.com/2020/01/pressure-vessel-inspection-as-per-asme.html Third ...

Third Party Inspection for Water Tube Boiler - Procedure

Reference Codes- Design code Purchase order specification Purchaser's standards Approved drawings ASME I ASME V ASME IX BS 1113 Required Documents for Third Party Inspector Review: Manufacture Quality Control Plan  ITP Data Sheet Approved Drawings Strength calculation sheets Material Test Reports WPS   and  PQR Welding Map Repair Procedure WQR NDE procedures (VT,RT,UT,MPT,DPT and PMI) NDE Personnel Qualifications Reports Heat treatment procedure Calibration Certificates for test equpments Hydrostatic Testing Procedure and Water Quality Document Painting Procedure Preservation,Packing and Shipping Procedure  Packing List Inspection activities for Water Tube Boiler -            (From start to finish)- Material Inspection Fabrication Tubes and Integral Piping Post Hydrostatic Testing Final Assembly Name Plate Checking Painting and coating  Spares, L...

Third Party Inspection for Fire Tube Boiler - Procedure

Reference Codes- Design code Purchase order specification Purchaser's standards Approved drawings ASME I ASME V ASME IX BS 2790 Inspection activities for Fire Tube Boiler-( From Start to Finish)  Material Inspection   Fabrication  Post Hydrostatic Test  Final Assembly  Marking  Name Plate Checking  Painting and Coating Inspection  Spares, Loose Items, Tools and Accessories:  Reporting  Release Note  Packing, Marking and Shipping:  Final Book (Dossier) . Documents for Third Party Inspector Review: Manufacture Quality Control Plan  ITP Data Sheet  Approved Drawings Strength calculation sheets Material Test Reports WPS   and  PQR Welding Map  Repair Procedure WQR NDE procedures (VT,RT,UT,MPT,DPT and PMI) NDE Personnel qualifications Reports Heat treatment procedure Calibration Certificates for test equip...

Important Point for Welding Inspector-SE-6

Important Point for Welding Inspector-which keep in mind for vendor fabrication inspection (check and review all given things). Availability of aprroved drawing Availability of material Availability of approved wps Welding engineer will write the wps Welder will make a test coupen according to this wps. Ndt of this test coupen Dt test After aprroval of wps next welder qualification. After welder qualification. card to welder Visual inspection of shop NDT Report Important point for Welding Inspector-SE-1 https://upendratiwari786.blogspot.com/2020/01/important-point-for-welding-inspector-1.html Important point for Welding Inspector -SE-2 https://upendratiwari786.blogspot.com/2020/01/typical-duties-of-welding-inspector-se-2.html Important point for Welding Inspector - (Duties before welding)-SE-3 https://upendratiwari786.blogspot.com/2020/01/typical-duties-of-welding-inspector_24.html Important point for Welding Inspector- (Duties during welding...